CLIENT: Belvista
LOCATION: Bicton

External works

External cladding used on this project was a combination of the Duraplank wood grain and the Duratex fibre cement lining both on 35mm top hats with vapour barrier to perimeter of building.

Fire rated walls utilising the BGC fire rated plasterboard system to comply with requirement.

Duralux fibre cement with express joints to external soffit.

Internal works

Plasterboard wall lining to internal walls with Thermal and Acoustic insulation

Plasterboard ceilings with shadow line finish to wet areas designated rooms.

1200×600 mineral fibre tiles on an exposed grid ceiling system to activity rooms.